logo-sized-clean-500

Submit to FacebookSubmit to Google PlusSubmit to TwitterSubmit to LinkedIn

Separate sealed bids for construction of the Fillmore Airport BLM Apron Improvements will be received by Fillmore City from bidders. Bids will be publicly opened and read aloud at 2:00 pm on May 4, 2017 at the Fillmore City office located at 75 West Center St. Fillmore, Utah. The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS. This project includes the reconstruction of a 37,000 sq ft asphalt apron and construction of a concrete trench drain system. Plans and specifications have been prepared by Sunrise Engineering, Inc. and will be available after April 14, 2017 on their website plan room at http:// www.sunrise-eng.com. Click on “Plan Room” at the bottom of the homepage. Bidders must register and sign-in and choose to become a plan holder to obtain access to CONTRACT DOCUMENTS and DRAWINGS. Notices regarding changes/amendments to the CONTRACT DOCUMENTS and DRAWINGS will be sent to the e-mail address associated with the bidder’s registration. Bidders are responsible to maintain current and correct contact information and check the plan room often to receive updates or additional documents/changes/amendments. The ENGINEER for this Contract will be Sunrise Engineering, Inc. and they will be represented by Zane W. Pentz, P.E. as Project Engineer. Published in Millard County Chronicle Progress on APRIL 12, 19, 26, 2017.